Date: July 30, 2001

Place:  Berg's 24 Hour Towing lot

The owner called us to help upright this camper after a severe wind storm passed through the area.  
Due to the position of the camper and the obstacles in the way at owner's farm, we decided to load and haul the camper into our lot to upright.

Our Unit #12, 14 ton crane, was used to lift the camper onto our hydraulic trailer.

 

After the camper was unloaded from our semi trailer, we used two units to upright this camper correctly.

Our Unit #11, 30 ton heavy duty wrecker, was used to winch the camper back onto its wheels.

Our Unit #12, was used to stabilize the camper for a soft landing. 

After the camper was up righted, we hooked it up to our Unit #4 to be towed to an insurance adjuster's lot.

By using all of the above techniques, we saved the camper owner any further damage.

Date:  November 5, 2000

Place:  Interstate 94 east of Bismarck

The very lucky driver of this semi survived his crash after he rear ended another tractor trailer on the interstate.

 

Date:  January 17, 2001

Place:  Mile marker 124 Interstate 94

This tractor trailer caught fire while driving down the interstate.  All the tires burnt off this car trailer.

We used our Unit #11 to lift the trailer up.
Then our Unit#20-33T backed under the car trailer to winch it onto the bed.

All of the six new vehicles were a complete loss.

Date:  1997

Place:  Green River rest area Interstate 94 west bound, just east of Dickinson.

This tractor trailer was going to fast for the curve at the rest area. 

Ficek Wrecker Service of Dickinson, ND called us to help set this rig back onto its wheels. 

We dispatched Unit #12, our crane, to assist.

Date:  June 9th, 2001

Place:  Marina Bay, Mandan, ND

A hail/wind storm went through the area.  Numerous pontoons were flipped over which kept our crane busy for a while.